STRIPS by Scrum Manager
← All strips

The Same Beat on Both Tracks?

A Scrum Manager strip

Four-panel comic strip: at 7:00 AM the AI screen has the work ready and waits for the daily in an empty office; at 9:30 AM he rushes in and nothing has moved; at 5:00 PM the AI is on task forty and he is on task four; she draws two tracks on a whiteboard, people and agents, joined by two gates.
The concept

Dual track is, in Agile Bedrock's definition, an architecture in which two modes of work coexist and synchronize at specific points, not at every step. It is the answer that best preserves the value of the framework when people and agents that execute work autonomously live in the same team, "because their natural rhythms are incompatible and forcing them into the same beat degrades both". Synchronization happens at the quality gates: the human track feeds the assisted one well-defined problems with clear acceptance criteria, and the assisted track returns finished increments for validation. Tying both tracks to a single beat produces both risks of the model at once: empty formality — the human track waits for its meeting while the assisted one delivered hours ago — and disconnection — the assisted track runs so fast that the human stops validating.

Want to keep pulling the thread? This topic unfolds in Agile Bedrock (v 1.1) > Rhythm architectures > Dual channel.

Share this strip

Copy link X LinkedIn
Get them by email →